Products
Large Final cooling Tunnel(Vertical)
high quality
Description
Download
Chocolate Cooling Tunnel Series | |||||
No. | Product | Running Speed | Power | Weight | Dimension |
D1 | Pre-cooling Tunnel(Horizontal) | ≤12 mould/min | 5.3 Kw | 950.0 Kw | 2.3m*1m*2.5m |
D2 | Final cooling Tunnel(Horizontal) | ≤12 mould/min | 15.2 Kw | 2350.0 Kw | 8.3m*1m*2.4m |
D3 | Pre-cooling Tunnel(Vertical) | ≤12 mould/min | 5.3 Kw | 950.0 Kw | 2.3m*1m*2.5m |
D4 | Final cooling Tunnel(Vertical) | ≤12 mould/min | 15.2 Kw | 1850.0 Kw | 6.3m*1m*2.4m |
D5 | Large Final cooling Tunnel(Vertical) | ≤24 mould/min | 27.5 Kw | 3120.0 Kw | 12.6m*1m*2.4m |
Equipment Overview
The final cooling tunnel is applicable for product final cooling, which is featured by up-down translational motion, small covering area, energy saving of more than 30%, advanced equipment control system, visible display and easy operation.
Equipment Description
Final Cooling Tunnel [Type: LSD-4*132A]
■ Up-down translational design;
■ Mold quantity: 528 pcs;
■ Energy-saving of more than 30%;
■ Running speed: ≤20molds/min.;
■ Water cooling or wind cooling;
■ Auto start or stop due to machine failure;
■ Small covering area.
Share your thoughts
6
0
Read more
Your rating
*
Name *
Email *
Upload Image
Notice: Ensure your image is no larger than 200KB before uploading.
Submit
Contact Us Now
Enter your inquiry details, We will reply you in 24 hours.
Name can't be empty
E-mail can't be empty
Company can't be empty
Phone can't be empty
Phone
Products can't be empty
Products you want
Message can't be empty
Verification code error
Clear